Project Overview
Project consisted of the new construction of a 20,000 square foot metal building designed to house the district’s technical program.
SMC Scope of Work
This project was a Publically Opened project and SMC was awarded the HVAC contract. The HVAC system consisted of a closed loop, geothermal system. SMC prefabricated the new mechanical room piping offsite as well as the ductwork to speed up our installation time onsite.